Recently Completed Projects

Recently Completed Projects

 

St theodoreSt. Theodore Apartments – Seattle

In 2016, Steadfast worked with a building envelope consultant to address leaking windows on three sides of this 65’ building. A particular challenge was accessing the building’s upper stories; Steadfast used a swing stage scaffold and boom lift to install new window flashing, building paper, and siding. In addition, structural dry rot repairs and decks waterproofing was performed where water had been leaking into the building.

 

 

 

CarvelCarvel at Harbour Pointe Leasing Office Remodel – Mukilteo

Under a tight, end-of-year deadline, Steadfast successfully completed a high-end office and clubhouse remodel. To do so, Steadfast hired local flooring and cabinet installers to craft high-quality finish details. Furthermore, a skilled woodworker crafted one-of-a-kind barn doors to function as office doors. As a result, what had been an out-dated space transformed into a beautiful space filled with carefully-crafted details.

 

 

 

Sancerre ApartmentsSancerre Apartments – Kirkland

Over the course of a multi-year renovation project, Steadfast completed the repair and painting of six cedar-sided buildings. Steadfast provided several color scheme options. As a result, buildings fit within the wooded surroundings while corridors are well-lit and provide better safety. In addition, Steadfast replaced deteriorated siding and deck boards. In instances of construction flaws and structural damages, Steadfast worked with the owner to provide timely estimates and needed repairs.

 

 

 

Barnes LakeBarnes Lake Condominiums – Lacey

As part of a water-intrusion repair team, Steadfast helped address construction design flaws at an older condominium complex. Steadfast completed dry rot repairs simultaneously with roofing contractors correcting insufficient roof slope. In cases of poorly-designed decks, Steadfast worked with a designer to install new custom metal railing systems. Additionally, Steadfast replaced concrete pathways and upgraded the ground drainage system causing water intrusion in nearby basements.

 

 

 

Harrington SquareHarrington Square Apartments – Renton

Steadfast repaired water-intrusion damages caused by roof drainage issues. Resulting from strong past performance, the Harrington Square property management team hired Steadfast to complete investigative work and building repairs in fourth- and fifth-floor units. Steadfast partnered with a structural engineer to fix dry rot damage. With sensitivity to residents, Steadfast planned work ahead and quickly finished repairs, therefore minimizing inconvenience to those living in the damaged units.

 

 

 

Etruria CondominiumsEtruria Condominiums – Seattle

In 2016, Steadfast completed a full exterior repaint of this three-story, 18-unit condominium building. With a successful track record on past projects, Steadfast was the Board’s top choice. The tight work space and height of the building required Steadfast to erect pump jack scaffolding at two facades while maintaining safe access for the building occupants. With the tight work space, Steadfast took extra care to protect residents’ and neighbors’ property from paint overspray.