Hampton East Townhomes

The existing paint and caulking at this job site was old and peeling, which meant that it needed to be scraped away. After properly preparing the surfaces of the siding, we painted all exterior surfaces requested by the customer. This job was completed in a cold season, which required us to return in a warmer season to complete the work for the paint to set properly.